Three named housing projects in Calabasas are now approved or underway, and together they add about 285 homes. Seventy of them are planned as homes for sale. Those 70 sit on a hillside at Las Virgenes Road and Agoura Road where the city's schedule puts the start of grading in January 2027.
The city didn't pick this mix. State housing law and a court ruling the city lost brought it about. If you're comparing Calabasas with Agoura Hills, Westlake Village or Thousand Oaks and expecting new construction to ease the competition for homes you can own, the map below shows why that relief is further off than the headlines suggest.
The Lawsuit Calabasas Lost Produced Fewer Homes
West Village at Calabasas is a 77-acre vacant site at 4790 Las Virgenes Road, at the eastern end of Agoura Road. The best way to see where Calabasas housing stands is to follow how this one project changed over time.
- The 2021 proposal. The New Home Company asked to build 180 condominium and townhouse units in fifteen three-story buildings. Eighteen of them were to be affordable to very-low-income households, and the plan included a small retail center and a park.
- The court ruling. The city denied the project. On November 27, 2023, Superior Court Judge Curtis Kin ruled against the city and ordered it to allow all 180 units without further review.
- The settlement. The city and the developer then negotiated a settlement that switched the project from multifamily buildings to single-family homes and capped it at 76 units.
- The approval. On August 14, 2024, the City Council approved 70 detached homes, all at market rate. The developer pays an in-lieu fee for affordable housing instead of building those units. A city staff report put that payment at about $2.25 million after a $3.25 million credit written into the settlement.
The city lost in court and still ended up with a smaller project. The trade cost 110 homes and every affordable unit that would have been built on the site. What remains is the only new for-sale housing in Calabasas with a construction schedule.
What Those 70 Homes Look Like on Paper
The approved plans call for three floor plans, all four-bedroom, two-story homes from 2,596 to 3,077 square feet, in Monterey, Spanish and Santa Barbara styles. The homes take up only about 13 acres. Roughly 64 acres become permanent open space, with a public trail easement linking to the New Millennium trail to the east.
The council approved the subdivision through a vesting tentative tract map "for condominium purposes," and the city's own description calls them "single-family detached condominium units." The August 2024 City Council staff report describes them as "for-sale detached residential condominium units." A house that stands on its own lot can still be legally set up as a condominium. If you plan to bid when sales open, ask the builder for the recorded ownership documents and have them reviewed by a qualified professional.
The timeline matters just as much. The city's posted schedule lists these steps:
- September 2026: surveys, staking, fencing and a temporary sound wall along Las Virgenes Road
- October 2026: oak tree removals and soils testing
- October through December 2026: off-site street work and utility connections
- December 2026: pre-mobilization for grading
- January 2027: grading begins
That grading is a large job. The 2024 staff report describes remedial work to stabilize an ancient landslide area on the southern part of the site, with roughly 2.4 million cubic yards of cut and about the same amount of fill, all balanced on site. The approved plans also add a third northbound lane on Las Virgenes Road. Those dates are a plan, and earthwork comes before any house is framed. As of mid-October 2026, the project's next phase is moving dirt.
The Other 215 Units Will Be Apartments
The rest of the pipeline is rental housing or close to it, and state law is the reason.
Avalon Calabasas. On September 30, 2026, a divided City Council denied an appeal of the expansion of the 600-unit Avalon Calabasas complex on the city's west side, between Lost Hills and Las Virgenes roads, The Acorn reported. Owner Vivmark Residential, formed in August through the merger of AvalonBay Communities and Equity Residential, can now add 135 apartments in nine three-story buildings on what are now tennis courts and surface parking.
Because 27 of those units are reserved for low-income renters, the project qualifies for a state density bonus. That lets the developer get waivers from some city standards, including setbacks and the 35-foot height limit, and it narrowed the city's grounds for denial. The city had listed the Avalon property as a possible housing site in its 2022 Housing Element update. Councilmember Peter Kraut voted against the appeal while voicing serious reservations, and The Acorn reported his explanation:
"Your fight's not here, it's in Sacramento."
Kraut also said "this development checks all of the boxes," and pointed to West Village as proof that a legal fight would be a lost cause. Mayor James Bozajian voted with the opponents and criticized the loss of local control over development.
The Commons at Calabasas. On the east side, the shopping center at 4719 Commons Way is adding 80 multifamily homes, four of them for very-low-income households. The council first approved the project on December 6, 2023, and approved a smaller revision on October 9, 2024. The city's project page calls the units apartment homes and forecasts that all construction, including the residential buildings, will be finished in Fall 2027.
The retail side has been changing first. The Acorn reported in August that Marmalade Cafe, an original 1998 tenant, closed on August 2 after nearly 30 years, citing the effect of construction on its business. The Regency Calabasas theater closed when groundbreaking began in February, Fresh Brothers Pizza has also closed, and Barnes & Noble is still open. The center's own construction updates list Rivian as open and Design Within Reach as coming soon. In February, The Acorn reported that new shops and restaurants could open by the end of 2026, with apartments following in 2027.
Set Against the State's Target
Calabasas's state-assigned housing target for 2021 through 2029 is 354 units. Of those, 132 are for very-low-income households, 71 for low-income, 70 for moderate-income and 81 for above-moderate.
| Project | Location | New homes | Reserved for lower-income households | Expected use | Status as of October 2026 |
|---|---|---|---|---|---|
| Avalon Calabasas expansion | Between Lost Hills and Las Virgenes roads | 135 | 27 | Apartments | Appeal denied September 30, 2026 |
| The Commons at Calabasas | 4719 Commons Way | 80 | 4 | Apartment homes | Under construction, completion forecast Fall 2027 |
| West Village at Calabasas | 4790 Las Virgenes Road | 70 | 0, in-lieu fee to be paid | For-sale detached condominium homes | Pre-grading, grading scheduled January 2027 |
Together, the three projects reserve 31 homes for lower-income households, against a combined lower-income target of 203. A fourth proposal, the 107-unit Park Apartments at 24100 Park Sorrento, would add 21 more reserved units. Its application dates from 2022, and the city lists its hearing as awaiting code compliance.
The gap explains why the pressure on Calabasas hasn't let up. The state's tools reward projects that include affordable units, and density bonuses make those projects hard to deny. Large owners of rental property are the developers best set up to use those tools. Every project that has made it through this process is mostly rental, except the one shaped by a court settlement, which ended up with no affordable units on site at all.
What This Means If You're Shopping Calabasas Next Spring
For a buyer, the practical point is simple. New construction in Calabasas over the next two years will mostly add renters, and the for-sale market will keep running on existing homes. Avalon's 135 apartments and The Commons' 80 give renters more choices. They don't give an owner-occupant another listing to bid on. West Village's 70 homes are the only new supply aimed at you, and they will arrive after the landslide work, the street work and a full build cycle.
Geography matters too. Most of this activity sits along the Las Virgenes corridor on the west side and around Commons Way on the east. If you're weighing a home near either one, think about the construction period as well as the finished result. That includes the third northbound lane on Las Virgenes, the off-site utility work scheduled through December, and a shopping center being rebuilt around the tenants that stayed open.
One more timing point. When West Village does release homes, they will be four-bedroom floor plans in a narrow size band, sold under a condominium map. That makes them a specific product. They will compete most directly with resale homes of similar size, and much less with smaller condos or larger estate properties elsewhere in the city. This is general information, not legal or financial advice. Confirm ownership structure, association terms and density-bonus rules for your own situation with a real estate attorney or other qualified professional.
If you're trying to decide whether to buy a Calabasas resale home now or wait for West Village's first release, Paula Kropp can go through the timing with you, including which streets sit closest to the construction and which existing homes will compete with the new floor plans. Schedule My Clarity Call.